Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
Plato Industry (M) Sdn Bhd
Plato Industry (M) Sdn Bhd 1358868-P
Business
Hours
Monday - Friday 8:30 AM - 5:30 PM
Saturday - Sunday Closed
We′re closed on Public Holiday
Open Closed
SSM

14-Sep-2023

   

Installation Guidelines
 

 
1. Install trusses and purlins with good quality materials. It can be high quality wooden, metal or stainless steel. The distance of trusses and purlins should be conformed to standard of supplier’s instruction. (The maximum purlin span for roof sheet is 850mm).

2. Install the roof sheets. Place them directly onto purlins that are attached to the roof trusses, beginning on the outside edge. The recommended length overlap is 200mm - 400mm. Close or seal off the ends with a wood or plastic strip under the roof sheet at each end. These will stop the entry of rain, wind and pests.

3. Pre-drill holes on the crest of roof sheet. Use a proper drill bit. Diameter of pre-drill holes must be 1-2mm more than the diameter of screw. Pre-drill holes on the end and side crest of the roof sheet, spacing the holes according to the wave.

4. Screw down the roof sheets through the pre-drill holes onto purlins with minimum 5 sets of screws in every square meter (m²). Continue across the roof until it is completely covered, lapping over the previous panel by one wave. Lapping over 2 wave in the heavy wind area. Adjust the lap so that the last panel completes thcoverage without making a cut lengthwise.

5. Complete the opposite side. If your roof is two-sided (and not just a single slope), repeat the installation on the other side of the roof, and install a corrugated ridge cap as you proceed across with the panels.
Send your message to Plato Industry (M) Sdn Bhd
Thank you for your inquiry!
Our Customer Support will be in touch with you shortly.
Your Name *
Your Company Name
Your Email *
Your Contact Number *
Subject *
Message *
Captcha *
Main Office

Plato Industry (M) Sdn Bhd 1358868-P
Lot 142, Batu 11 1/2, Jalan Kota Tinggi, 81800 Ulu Tiram, Johor, Malaysia.

Tel:
Fax:

Email:
Website: https://www.platoindustry.com.my
Website: https://platoindustry.newpages.com.my/
Website: https://platoindustry.n.my/

1
Hello! Thanks for visiting my site. Please press Start button to Contact with Admin :)

Start

Browse by : Home - Classifieds - Companies - Location - Tags - Products - News & Promotion - Job Vacancy - Mobile Website - Google - SEO Results

NEWPAGES

  • US 16892
  • GB 12317
  • CA 9964
  • AU 7816
  • IE 2501
  • SG 1207
  • IN 1057
  • NZ 968
People Online
Seni Jaya Logo
Brochure
Download
Our PackageContact Us