HVAC Application£º
- Check current draw in motors and compressors.
- Use MAX/MIN/Recording in the temperature mode to assess efficiency.
- Test run/start capacitors.
- Confirm low voltage control signals.
- Measure flame safeguard device current draw.
- Confirm power sources.
- Analyze temperature and voltage or current data with the aid of the time stamp.
- Insulation test up to 100M Ω.
- Check for energized circuits and balance loads.
- 1 Φ /3 Φ (3P3W/3P4W)Power analyzer.
- Evaluate electrical contacts.
- Capture motor in-rush current readings.
- Determine peak power demand periods.
- Verify line voltage stability.
- Monitor motors and other loads for excess heat.
- Check motor run/start capacitor values.