Pure Cooling Engineering & Services Sdn. Bhd.
Pure Cooling Engineering & Services Sdn. Bhd. 201501009671 (1135006-H)
Onesync AI SSM

雪兰莪,莎阿南 - UPC 1000 (Low Temperature Dehumidifier Batching Treatment)

21-Aug-2024

The UPC 1000 is a low-temperature dehumidifier designed for precise and efficient batching treatment. It excels in moisture removal while preserving material integrity, making it ideal for industries like pharmaceuticals, food processing, and chemical manufacturing. With robust construction and advanced technology, it ensures reliable performance, energy efficiency, and consistent quality in production. 
 
  • “ Less Weight, Less Volume, Less Cost "
  • Modular drying system customized to meet the specific requirements depending on the application.
  • Sludge weight and volume reduction by level.
  • Disposal cost reduction by as much as 60%; a better classification may be obtained sometimes.
  • Drying at low temperatures between 30C to 60C.
  • High efficiency through the use of refrigerant technology for air dehumidification.
  • Reliable and uniform drying.
  • Energy and cost savings through a perfect combination of air conditioning and air routing.
  • Drying in a closed circuit / system with less waste air.
  • Internal and external dryer unit insulated panel S/Steel SUS304 and bolt & nuts fully Stainless Steel.

Standard Operation Procedure
1. Fill in fresh sludge into Dryer Bucket to 1000kgs (with condition sludge moisture < 70% , dryness 20 – 30% and with cake form)
2. Push in bucket into Dryer unit below the ducting until bucket stop  (floor been mounted I-beam stopper)
3. Close / tight up supply air and return ducting (flexible canvas).
4. Turn ‘ON’ selector button to start operation entire unit (maximum operating 12hrs)


   
   

Electrical & Refrigerant Setting
  • Drying Time (8 – 12 Hrs per batch).
  • Compressor Overload 33 Amps. (actual running 27.8A)
  • Blower Overload 5.5 Amps. (actual running 2.8 - 3.0A)
  • Compressor High / Low Pressure Switch (Low=40psi  High=360psi).
  • Total running ampere 30A – 32A.
  • External Fan : 0.6A x 2 unit = 1.2A


      
   

Preventive Maintenance 
  • 1.   Every 2 batch to clean air intake filter with water only (do not use air pressure or water jet pump will damage the washable filter.)
  • 2.   Every month to carry out External Condenser Coil cleaning using water only (do not use water jet pump it will damage the Aluminium fins and chemical clean is advisable once a year). Close up / cover up control panel top part with plastic wrapping.
  • 3.   Every month to clean Cooling Coil or Heating Coil by water only (do not use water jet pump it will damage the aluminium fins and chemical clean is advisable once a year)
  • 4.   Every 3 month to check blower belting tension and condition (if found wear and tear immediate replace)


   
   


Maintenance Schedule
Maintenance Task Frequency
bi - batch Monthly Quaterly Yearly
Air Intake Filter Washable X      
Compressor Checks :        
Pressure Gauge   X    
Crankcase Heater (if required)   X    
Lugs and cable connections   X    
Pressure Switches - Set Point, Check Pressure HP & LP (at same time)   X    
Overload Protection Operaation     X  
Amps & Voltage   X    
Vibration or Grommet Support   X    
Refrigerant Circuit Checks :        
Charge and leaks (if needed)   X    
Filter Drier       X
TXV Functioning (if needed)       X
Pipe insulation   X    
Electrical Component Checks :        
General Inspection for loose connection   X    
Check Thermostat Operation   X    
Check Control Panel Operation and Outputs     X  
Check Volts and Amps for imbalance   X    
Check Overheating of motors   X    
Blower Belting     X  
Coils :        
Condensar, Cooling and Heating
- Clean with water only
  X    
Cabinet Checks :        
Inspect and clean rust     X  
Tighten loose screws   X    


Trouble Shooting
Fault Possible Causes Solution
Compressor does not run Power failure Check the power supply
Shut down by protection device Check and determine the causes
Drying time reach set point Check the control setting time
Compressor frequent cut in / cut out Over charged or insufficient refrigerant Check the amount refrigerant
High / Low Pressure Switch Manual reset - Push Green Button
Unsufficient Refrigerant Charge Refrigerant leak at the system
Compressor Noisy Power failure or wrong phase sequence Check the power supply
Refrigerant flow back Check Expansion Device superheat and valve opening position
Compressor internal Problem Replace Compressor
Insufficient Heating-Supply Air Insufficient Refrigerant Check unit for leaks. Add refrigerant for the system
Wrong expansion device setting Check Expansion Device superheat and valve opening position. Replace it if necessary
Filter Drier Choked Replace filter drier
Suction Tube Freezer Air flow rate choked / slow Clean air intake filter, sludge bucket air hole block or sludge too lumpy
Discharge Pressure Too High Refrigerant over-charged Remove the excess refrigerant
External fan faulty / tripped Check fan motor ohm and shorting issue. Replace it if necessary
Discharge Pressure Too Low Insufficient Refrigerant Check unit for leaks. Add refrigerant for the system
Insufficient air flow to cooling coil Clean air intake filter, sludge bucket air hole block or sludge too lumpy
Wrong expansion device setting Check expansion valve device superheat and opening position. Replace it if necessary
Blower Motor does not run Power failure Check the wiring
Motor malfunction Replace the motor or repair

For more information and inquire, please feel free to contact us. Thank You!
发信息至 Pure Cooling Engineering & Services Sdn. Bhd.
谢谢您的询问!
我们的客服会尽快联络您。
您的名字 *
您的公司名字
您的邮件 *
您的联络号码 *
标题 *
信息 *
验证码 *
总办事处

Pure Cooling Engineering & Services Sdn. Bhd. 201501009671 (1135006-H)
33-1, Jalan Eco Ardence D12/36D, Eco Ardence Seksyen U12, 40170 Shah Alam, Selangor, Malaysia.

电话:

邮件:
网址: https://www.purecooling.com.my
网址: https://purecooling.newpages.com.my/
网址: https://purecooling.onesync.my/

游览 : 首页 - 分类 - 公司 - 地区 - 标签 - 商品 - 消息与促销 - 工作征聘 - 手机版 - 谷歌 - 搜索引擎优化结果

NEWPAGES

  • US 16466
  • GB 11668
  • CA 10117
  • AU 7675
  • IE 1801
  • NZ 1523
  • IN 1444
  • BR 1317
人 在线
Seni Jaya Logo
Brochure
Download
Our PackageContact Us