- Supporting AIREI in Pioneering Design & Build for the World’s First AI-Driven Palm Oil Mill 3 照片
- Turnkey Installation Services for BWTS on LNG Berge Arzew at Shipyard in Spain 7 照片
- “LeesGreen” IMO Approved Ballast Water Management system 1 照片
- Alfa Laval Pureballast BWTS installation 10 照片
- Sunrui BWTS installation 25 照片
- Headway BWTS Installation 16 照片
- Installation of Alfa Laval PureSox Scrubber System 5 照片
- Orbital Welding 3 照片
- Delivery 8 照片
- Ballast Water Treatment System Installation 7 照片
- Site Installation 1 照片
- Insulation Work ( Vessel , Tank , Piping ) 6 照片
- 500TPD CPO WASHING & PRETREATMENT PLANT 6 照片
- IGG Modification on LNG Tanker 9 照片
- ELECTRICAL WORKS 6 照片
- Large Flowmeter Replacement 5 照片
- 10" Cooling Tower Water Supply & Return Pipeline 4 照片
- UV Sterilizer Installation & Commissioning 7 照片
- Lifting Methanol Column 3 照片
- Heat Exchanger Cleaning & Maintenance 4 照片
- On-Site Main Switchboard (MSB) Modification 3 照片
- Busbar Modification 2 照片
- Cable Tray Installation 4 照片
- Cable Pulling & Cable Laying 7 照片
- Cable Termination & Cable Dressing 9 照片
- Roof & Cladding Installation 4 照片
- Flow Meter Installation 2 照片
- Steam Tracing 3 照片
- Electrical Hydraulic Valve Control Panel Installation 3 照片
- Stainless Steel Pipe Installation 7 照片
- Blue Ocean Shield BWTS 41 照片
- 未分类 2 照片