Air Pollution Control System (Dust Collector, Scrubber, ESP) Design
For projects that require Environmental Impact Assessment (EIA) considerations, we support the air quality and emission control components by providing engineering inputs related to APCS design and performance intent. This includes defining emission sources, describing process and control technology, identifying expected pollutants, and outlining how the proposed APCS will achieve targeted control efficiency. We contribute design basis, equipment descriptions, flowrates, pressure drops, and stack/chimney considerations, including provisions for sampling ports and monitoring where applicable. Our deliverables are structured for integration into EIA documentation by appointed consultants, ensuring technical consistency between environmental commitments and the actual engineered system.
Preparing EIA and need solid APCS engineering inputs? We can support your consultant with technical deliverables.
APCS Design for EIA
Air Quality Impact Mitigation
Emission Control Design Input
Stack Design Support
Emission Source Characterization and Control Technology Selection
Chimney Sampling Port and Monitoring Provisions for EIA
Pejabat Utama
ESGPRO Engineering & Consultancy Sdn Bhd 202501017247 (1618661-X)
PT 15975 & PT 15976 Tingkat Atas, Jalan Air Putih, Kampung Jaya, 24000 Chukai, Terengganu, Malaysia.