Please login to use this feature. You can use this feature to add the product to your favourite list.
Close
You have added this product to your favorite list. Check My Favourite
Close
You have removed this product from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your favourites list.
Close
This company has been added successfully. Check My Favourite
Close
This company has been removed from your favourite list.
Close
Please login to use this feature. You can use this feature to add the company to your inquiry cart.
Close
This company has been added to your inquiry cart.
Close
This company has been removed from your inquiry cart.
Close
This product has been added to your inquiry cart.
Close
This product has been removed from your inquiry cart.
Close
Maximum number of Product/Company has been reached in inquiry cart.
Close
LLT Engineering Sdn Bhd
LLT Engineering Sdn Bhd 200401000378 (638881-H)

29-Jun-2023

LM-80 Drive Electronics

Drive/power electronics for LM-80 testing form the foundation for successful testing.  Selecting the best drive electronics is a very important decision.  

 
Drive Electronics Cabinet
Drive Electronics Cabinet

Selection criteria for your LM-80 drive/power electronics should include the following:

LM-80-08 Testing Requirements

  • Constant Current (DC mode)   (yes, with SpikeSafe current source; user selectable currents)
  • Pulse mode current (allowed LM-08-15)  (yes with SpikeSafe current source; user selectable currents and pulse settings)
  • Current accuracy less than 3%  (yes. SpikeSafe current source accuracy is less than 1%)
  • Temperature measurement monitoring and data logging (thermocouple – special limits wire) (yes)
  • Alternate temperature measurement monitoring techniques – RTD or thermistor (yes)
  • Minimum 6,000 hours test time (10,000 recommended)  (SpikeSafe MTBF 10,000 hours)
  • Duration timers set by operators stop testing and alert users that it is time for light measurements
  • Test Timing Uncertainty for the software application must be calculated to ensure minimum testing is achieved (yes)
  • RH less than 65%
  • AC ripple less than 2% (yes, with SpikeSafe current source)
  • NVLAP Self Certification
  • LM-80 audit (Vektrex systems have been successfully audited and are in use in many countries)

Other criteria for selection of your LM-80 drive / power electronics

  • Is the system constructed from high quality components?
  • What is the uptime and MTBF?
  • What is the Energy Efficiency?
  • Does the system include safety mechanisms for operators and devices?
  • What is the worldwide installation base?
  • Does the system meet the LM-80 Specifications?
  • Is the system NVLAP auditable?
  • Does the software support the test requirements?
  • Does the software include management functions that simplify test management?
  • Are you able to easily detect test anomalies?
  • Is the system scaleable and modular?
  • Does the system support a large voltage and current range ?

Vektrex LM-80 drive electronics are based upon industry standard SpikeSafe modules.


Hantar mesej anda ke LLT Engineering Sdn Bhd
Terima kasih untuk pertanyaan anda!
Perkhidmatan pelanggan kami akan menghubungi anda tidak lama lagi.
Nama Anda *
Nama Syarikat Anda
Emel Anda *
Nombor Telefon Anda *
Tajuk *
Mesej *
Captcha *
Pejabat Utama

LLT Engineering Sdn Bhd 200401000378 (638881-H)
20, Jalan Damar, Permatang Damar Laut, 11960 Bayan Lepas, Penang, Malaysia.

Tel:

Emel:
Laman Web: https://www.llt-engineering.com
Laman Web: https://llt-engineering.newpages.com.my/
Laman Web: https://llt-engineering.n.my/

Melayari Melalui : Laman Utama - Klasifikasi - Syarikat - Tempat - Tag - Produk - Berita Baru dan Promosi - Jawatan Kosong - Laman Web Mudah Alih - Google - Keputusan SEO

NEWPAGES

  • US 16476
  • GB 11198
  • CA 9295
  • AU 6555
  • IN 1396
  • NZ 1352
  • IE 1260
  • MY 1025
Orang dalam talian
Seni Jaya Logo
Brochure
Download
Our PackageContact Us